Floating Port (Gaza) arrives in Libya’s Al-Bouri oil field

The Floating Port (Gaza) has arrived this morning in Al-Bouri oil field after coming from Busan, South Korea, from STX company. The new floating port will replace the old one (Sloog) on the oil field’s platform (4).
The floating port is considered one of the biggest ships in the world and has a capacity of over one million and a half oil barrels.
The floating port was towed to Al-Bouri oil field in Libya by the Tow Company POSH TERASEA under the supervision of STX Offshore & Shipbuilding for the Milletah Oil & Gas Company and by the request of Tripoli National Oil Corporation.
How to submit an Op-Ed: Libyan Express accepts opinion articles on a wide range of topics. Submissions may be sent to oped@libyanexpress.com. Please include ‘Op-Ed’ in the subject line.
- Parliament spokesman denies obstruction after Libyan MPs allege lockout - September 22, 2026
- Hunger strikers’ welfare raised in joint appeal over Tunis detentions - September 22, 2026
- Zawiya refinery faces disruption after Sharara pipeline closure - September 22, 2026